Ads Advanedge: Mastering Your Advertising Strategy

Published on: May 13 2023 by pipiads

Advantage Pipe: The Ultimate Solution for Athletic Field Drainage

Athletic fields, whether natural or synthetic, need proper drainage to ensure performance and safety. Advantage Pipe, produced by Advanced Drainage Systems, is the perfect solution for athletic field drainage.

Advantages of Advantage Pipe:

- Twice the soil contact area compared to four-inch round pipe

- Higher flow capacity compared to various geocomposites

- Low profile design allows for horizontal or vertical installation

- Long length coils for quick and efficient installation

- High-density polyethylene (HDPE) material for long lifespan

- Sturdy structural design does not require a geotextile wrap for structural integrity

Installation:

- Lay geotextile over prepared bedding or subgrade

- Install perimeter discharge drain lines using round ABS and 12 perforated pipe

- Place Advantage Pipe on subgrade every 20-25 feet

- Terminate Advantage Pipe into drainage gravel envelope or connect directly to perimeter DSN 12 pipe

- Use staples or 60 penny nails to prevent movement and gravel infiltration during backfill

- Use Advantage couplers and coupler pins to connect pipes

- Spread gravel backfill laterally to drain lines, maintaining a minimum of six inches of gravel cover

Testimonials:

- We've been using Advantage Pipe for the last 12 years in our synthetic turf installations. We especially like the 12-inch Advantage for its simplicity of installation and adaptors they can supply. - Anonymous user

- It's just a great product. Dozers and tractors can run over the product with ease. - Anonymous user

Advantage Pipe is the preferred product for athletic field construction, from high school to professional levels. Its durability, mobility, and ease of installation make it the ultimate solution for athletic field drainage.

StormTech Installation

Advanced Drainage Systems (ADS) is the world's largest stormwater solution company, and its division, ATS Staunton, is a leading supplier of stormwater chambers. Proper installation of stormwater chambers can help save valuable land and protect water resources. This article provides guidance on the installation of MC 3500 and 4500 chambers.

Important Terms:

Foundation stone refers to the crushed angular stone under the chambers, while embedment stone is the crushed angular stone between the chambers to a depth of at least 12 inches over the top of the chambers.

Installation Steps:

1. Pre-con meeting: Set up a meeting to discuss the required steps, establish a timeline, and determine an appropriate method for placement of embedment stone.

2. Embedment stone placement: There are three commonly applied methods for backfilling embedment stone - stone shooter, laying one or more chambers at a time, and equipment positioned outside of the excavation. Dump and push is not an acceptable method.

3. Confirm ship date and inventory: Confirm the ship date of materials and inventory the appropriate number of chambers, end caps, and manifolds.

4. Excavate the bed and prepare subgrade: Allow for 12 inches of perimeter stone parallel to chamber rows and 12 inches of perimeter stone from the base of all end caps. Place a nonwoven geo-textile over the prepared bed and up the walls. Compact the foundation stone to achieve a flat surface.

5. Place chambers: A single layer of woven fabric is to be placed on the foundation stone at all inlet rows and the manifold. Use a double layer of woven fabric for the entire length of the isolator row before the chambers are assembled. Nonwoven fabric is to be placed on top of the inlet connection and around the entire chamber system, including the manifolds.

6. Backfill embedment stone: A minimum of 9 inches spacing must exist between chamber rows, and non-degradable spacers such as brick can be used for layout convenience. The end caps should be left off until the correct placement of stone can be visually verified. Backfill embedment stone evenly across the width of the bed, including the perimeter, to achieve proper support of the outside rows and end gaps.

7. Fully support chambers: Chambers must be fully supported by embedment stone extending all the way to the excavation wall to a depth of at least 12 inches over the top of the chambers before any loads are placed on the bed.

Proper installation of stormwater chambers is essential to save valuable land and protect water resources. Following the steps outlined in this article and referring to storm tech resources can result in the proper installation of a storm tech chamber system.

StormTech Installation Video

Advanced Drainage Systems is the world's largest stormwater solutions provider. StormTech, a division of ATS, is a leading supplier of chambers for stormwater management. Make the most advanced name in drainage part of your project.

Installation:

- If your project requires the SC310 or SC740 chambers, please refer to a separate installation manual.

- A properly installed StormTech chamber system will help you and your clients save valuable land and protect water resources.

- Define two important terms: the foundation stone and the embedment stone.

Backfilling Methods:

- Set up a pre-con meeting to discuss required steps, establish a timeline, and determine an appropriate method for placement of embedment stone.

- Three commonly applied methods for placement of embedment stone: method 1 (a stone shooter), method 2 (laying chambers across the bed), and method 3 (placing stone by equipment positioned outside of the excavation).

- Never place equipment on the bed, as it can cause distortion of chambers.

Dump and Push Method:

- Dump and push is not an acceptable method to place embedment stone around and above chambers.

- Any damage resulting from the use of this method will not be covered by the standard ABS product warranty.

- The operator may push perpendicular or diagonally across the rows as the backfilling proceeds along the bed, causing distortion of chambers.

Installation:

- Confirm the ship date of materials and projected start date.

- Inventory the appropriate number of chambers, end caps, and manifolds per the engineer's plans.

- Use clean crushed angular ash toe M43 number three or four as acceptable foundation stone.

- Excavate the bed and prepare the subgrade.

- Place a non-woven geotextile over the prepared bed and up the walls.

- Place and compact the foundation stone to achieve a flat surface before placing the chambers.

- Non-woven fabric is to be placed on top of the inlet connection and around the entire chamber system.

- The manifold pipe must be inserted a minimum of 12 inches into the end caps.

- Be sure there is a tight fit between the pipe and the end cap.

- For the MC3500, use three screws to secure the end caps. No screws are required for the MC4500 end caps.

- Leave the end caps off of either end of the rows until the correct placement of stone can be visually verified.

Backfilling:

- A minimum 9 inches spacing must exist between chamber rows.

- Non-degradable spacers such as brick can be used for layout convenience.

- For the MC4500 chambers, a total of 6 screws must be used at each chamber joint.

- Perimeter stone must extend horizontally to the excavation wall for straight or sloped sidewalls.

- The contractor may elect to reconstruct vertical excavation walls limited by OSHA requirements by placing and compacting soils outside the separation fabric.

- The chambers must be fully supported by embedment stone extending all the way to the excavation wall to a depth of at least 12 inches over the top of the chambers before any loads are placed on the bed.

- Construction vehicle loading must be in accordance with tables found in the MC3500 and MC4500 StormTech construction guide.

- Rollers and dozers must work in parallel to chamber rows.

- Minimum cover depth from the top of the chamber must not be less than 24 inches to the base of the flexible pavement.

- Maximum cover depth from the top of the chamber must not be greater than 7 feet for the MC4500 and 6.5 feet for the MC3500.

By following these steps and referring to the StormTech construction guide and other resources, you can properly install a StormTech chamber system. For more information on StormTech products, visit www.meliar.com/mpanel.htm or call 22694 to speak with a representative.

Learn More About ADS (Advanced Drainage Systems)

In this interview, Jesse Allen from the American Ag Network is joined by Darla Huff and Ryan Carter from ADS (Advanced Drainage Systems) to discuss their water management solutions company and the trends they are seeing in the demand for water management systems.

Key Points:

1. ADS is a water management solutions company that offers a full portfolio of products for stormwater, retention, detention, and agriculture.

2. The demand for water management systems is growing rapidly, especially in agriculture, where farmers are recognizing the benefits of installing drainage tiles for both drainage and irrigation purposes.

3. To respond to this increased demand, ADS is investing in capital improvements and increasing production capacity, while also focusing on sustainability and environmental stewardship.

4. ADS is committed to providing tools that help farmers manage water and keep regulations off of them, while also increasing profitability and yield.

5. Customers can reach out to ADS through their website and contact a sales rep to discuss their specific needs and market.

ADS is a leader in water management solutions and is dedicated to providing innovative products and services that help farmers manage their land and water resources. As the demand for water management systems continues to grow, ADS is well-positioned to lead the market and help farmers plan for their future tiling projects.

ADS vs The Baughman Gold

In this article, we will discuss the differences between Baughman gold pipe and Home Depot pipe. We will explore why Baughman gold is a better option and how it can improve your drainage system.

Differences between Baughman Gold and Home Depot Pipe:

- Home Depot pipe has a green stripe that indicates it is not durable.

- Baughman gold is engineered to remove debris and create less turbulence, ensuring better water flow.

- Home Depot pipe is flimsy, while Baughman gold is square and much stronger.

- Baughman gold is heavy-duty and durable, while Home Depot pipe is known to collapse easily.

Why Baughman Gold is a Better Option:

- Baughman gold is designed to withstand extreme weather conditions, making it a better long-term investment.

- Baughman gold is engineered to improve water flow and prevent debris build-up.

- Baughman gold is heavy-duty and can withstand heavy traffic and weight.

- Baughman gold is square on the outside, making it easier to install and handle.

If you want a drainage system that works efficiently and lasts for a long time, then Baughman gold is the better option. It is strong, durable, and engineered to remove debris and improve water flow. Don't settle for flimsy Home Depot pipes that collapse easily and cause drainage problems. Choose Baughman gold and enjoy a better drainage system.

Unloading ADS Pipe! (Time Lapse)

In this article, we will discuss the importance of financial commitment when it comes to making major purchases, such as buying a new vehicle. We will use a personal anecdote to illustrate the difference between buying with emotional impulse versus financial responsibility.

Main points:

- Impulse buying can lead to overspending and financial stress

- Taking time to research and consider options can lead to better financial decisions

- Paying with cash or check can save money in the long run compared to borrowing money

Anecdote:

The author shares a personal experience of needing a new truck but feeling emotionally irritated and stressed. They wanted to immediately buy a brand new truck but their spouse suggested taking time to look online for used options. The author ultimately found a used truck and paid cash for it, which saved them money in the long run.

In conclusion, it is important to make financial commitments and decisions based on research and consideration rather than emotional impulses. Paying with cash or check can also save money in the long run compared to borrowing money.

ADS Pipes Catalog into AutoCAD Civil 3D

Advanced Drainage Systems (ADS) is a leading manufacturer of high-performance thermoplastic corrugated pipes. Their products provide comprehensive water management solutions for construction and infrastructure projects. This article will provide a guide on how to load ADS pipe catalogs into Autodesk AutoCAD Civil 3D.

Steps to Load ADS Pipe Catalogs:

1. Extract the ADS pipe catalog folder and copy it to your computer.

2. Locate the civil3d pipes catalog location by going to Civil3D > Create Design Ribbon > Set Pipe Network Catalog.

3. Copy and paste the ADS pipes folder into the pipes folder in your civil3d pipes catalog location.

4. Type in part catalog regen in the command prompt and click on pipe to add the pipes to the part catalog.

5. Add ADS part families to the current part list by clicking on Pipe Network > Pipe Network Creation Tools > Network Part List.

6. Find the network part list you want to add ADS part families to and click on storm sewer to add the part families.

7. Add the part sizes to your part list by clicking on Add Part Size and selecting Add All Sizes.

8. Repeat steps 6 and 7 for other part lists.

9. Click Apply and OK to finish adding ADS pipes to your pipe network.

With ADS pipes now added to your pipe network, you can make the most advanced water management solutions a part of your next project. For additional information, contact ABS at 808-216-7100, visit www.ads-pipe.com, or contact your local ADS office or sales representative.